The pipe and fittings for the office are in and I installed a CO2/LP flush 12v monitor.
Pipe fittings and pipe
CO2/LP monitor (blue tape is planning for shelves)
This entry was posted
on Sunday, November 18th, 2012 at 7:00 pm and is filed under Gas, Office space.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.