Committed to the industrial look

Written by

in

,

The pipe and fittings for the office are in and I installed a CO2/LP flush 12v monitor.

IMG_1019
Pipe fittings and pipe
IMG_1026
CO2/LP monitor (blue tape is planning for shelves)

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *