The dome installed with window trim and under lights polished and wired in.
This entry was posted
on Sunday, March 11th, 2012 at 8:52 pm and is filed under Front Section, Walls.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.