Converter hole cut and installed (needs to be wired still). Plumbing connected in the back, moving forward.
This entry was posted
on Thursday, May 10th, 2012 at 10:22 am and is filed under Walls.
You can follow any responses to this entry through the RSS 2.0 feed.
You can leave a response, or trackback from your own site.